Skip to content

fix race in reintegration + down2up fix#17649

Draft
gnailzenh wants to merge 8 commits intomasterfrom
liang/rebuild/b_rebuild_fixes
Draft

fix race in reintegration + down2up fix#17649
gnailzenh wants to merge 8 commits intomasterfrom
liang/rebuild/b_rebuild_fixes

Conversation

@gnailzenh
Copy link
Contributor

Steps for the author:

  • Commit message follows the guidelines.
  • Appropriate Features or Test-tag pragmas were used.
  • Appropriate Functional Test Stages were run.
  • At least two positive code reviews including at least one code owner from each category referenced in the PR.
  • Testing is complete. If necessary, forced-landing label added and a reason added in a comment.

After all prior steps are complete:

  • Gatekeeper requested (daos-gatekeeper added as a reviewer).

- pool_discard doesn't wait for completion of discard anymore
- Make sure no concurrent discards

Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
- code simplification
- fix a bug for discard ULT

Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
Signed-off-by: Liang Zhen <gnailzenh@gmail.com>
@github-actions
Copy link

github-actions bot commented Mar 5, 2026

Errors are component not formatted correctly,Ticket number prefix incorrect,PR title is malformatted. See https://daosio.atlassian.net/wiki/spaces/DC/pages/11133911069/Commit+Comments,Unable to load ticket data
https://daosio.atlassian.net/browse/fix

@daosbuild3
Copy link
Collaborator

Test stage Build on Leap 15.5 with Intel-C and TARGET_PREFIX completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net//job/daos-stack/job/daos/view/change-requests/job/PR-17649/1/execution/node/284/log

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Development

Successfully merging this pull request may close these issues.

2 participants