forked from christophenoel/geozarr-spec
-
Notifications
You must be signed in to change notification settings - Fork 16
Open
Labels
Milestone
Description
Summary
Conduct the formal Standards Working Group vote to adopt GeoZarr as an OGC Standard.
Background
After OAB review and public comment resolution, the SWG conducts a formal vote to adopt the candidate Standard. A successful vote results in GeoZarr becoming an official OGC Standard.
From the GeoZarr charter (Section 4):
"Reference implementations that fully use GeoZarr should be documented at the same time the candidate Standard goes to vote."
Process Overview
1. Pre-Vote Checklist
Before calling the vote:
- OAB review complete (OGC Architecture Board Review and Public Comment #118)
- All public comments addressed
- Final candidate Standard document prepared
- Implementation reports available (minimum 3 implementations for Candidate maturity)
- SWG members notified of upcoming vote
2. Vote Announcement
- Formal vote announced to SWG members
- Voting period defined (typically 2 weeks)
- Final document package distributed
- Voting instructions provided
3. Voting Period
Per OGC policies:
- Only SWG members may vote
- Votes: Yes, No, Abstain
- Quorum requirements must be met
- No votes must include written justification
4. Vote Resolution
If vote passes:
- Results documented
- Standard submitted for final OGC approval
- Publication process initiated
If vote fails:
- Review "No" vote justifications
- Determine required changes
- Return to revision cycle
- Schedule new vote after changes
5. Post-Vote Publication
- OGC publishes official Standard
- Press release prepared
- Community announcement
- Update convention READMEs to reflect "Stable" status
Acceptance Criteria
- Quorum achieved
- Vote passes per OGC requirements
- Results documented and submitted to OGC
- GeoZarr v1.0 published as OGC Standard
What to Expect
For SWG Members:
- Review final document package before voting
- Cast vote during voting period
- Provide justification if voting "No"
For Community:
- Vote is limited to SWG members
- Results will be announced publicly
- Standard will be freely available after publication
Timeline
Typical timeline from vote call to publication:
- Vote announcement: Day 0
- Voting period: Days 1-14
- Results certification: Days 15-21
- OGC publication: Days 22-30+
Dependencies
- OGC Architecture Board Review and Public Comment #118 (OAB Review) must be complete
References
- GeoZarr SWG Charter (Section 5: IPR Policy)
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
Type
Projects
Status
Todo