Skip to content

feat: retry transient S3 rate-limit errors with configurable delay #236

feat: retry transient S3 rate-limit errors with configurable delay

feat: retry transient S3 rate-limit errors with configurable delay #236

Triggered via pull request February 25, 2026 17:06
Status Cancelled
Total duration 1m 45s
Artifacts

tests.yml

on: pull_request
Build & Unit
56s
Build & Unit
Matrix: E2E Test
Fit to window
Zoom out
Zoom in

Annotations

13 errors
E2E Test (DOSpacesTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
E2E Test (DOSpacesTest)
The operation was canceled.
E2E Test (LinodeTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
E2E Test (LinodeTest)
The operation was canceled.
E2E Test (AWSTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
E2E Test (AWSTest)
The operation was canceled.
E2E Test (BackblazeTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
E2E Test (BackblazeTest)
The operation was canceled.
Tests
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
E2E Test (WasabiTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
E2E Test (WasabiTest)
The operation was canceled.
E2E Test (LocalTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
E2E Test (LocalTest)
The operation was canceled.