feat: retry transient S3 rate-limit errors with configurable delay #234
Triggered via pull request
February 25, 2026 17:02
Status
Cancelled
Total duration
1m 39s
Artifacts
–
tests.yml
on: pull_request
Build & Unit
58s
Matrix: E2E Test
Annotations
13 errors
|
E2E Test (BackblazeTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
|
|
E2E Test (BackblazeTest)
The operation was canceled.
|
|
E2E Test (LinodeTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
|
|
E2E Test (LinodeTest)
The operation was canceled.
|
|
E2E Test (DOSpacesTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
|
|
E2E Test (DOSpacesTest)
The operation was canceled.
|
|
E2E Test (AWSTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
|
|
E2E Test (AWSTest)
The operation was canceled.
|
|
E2E Test (WasabiTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
|
|
E2E Test (WasabiTest)
The operation was canceled.
|
|
E2E Test (LocalTest)
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
|
|
E2E Test (LocalTest)
The operation was canceled.
|
|
Tests
Canceling since a higher priority waiting request for Tests-refs/pull/159/merge exists
|