We're getting an IBM Fusion HCI loaner!
Rough hardware specs:
3x Fusion HCI Storage Server (9155-C10)
- 2x 7.68TB NVMe PCIe5.0,
- 2x 960GB M.2 NVMe OS-Laufwerke (RAID 1)
- 32 Cores (2x 16-Core Intel Gold 6426Y 2.5GHz 185W )
3x Fusion HCI Storage Server (9155-C10)
- 2x 7.68TB NVMe PCIe5.0
- 1x 1.6TB Local Storage Drive
- 2x 960GB M.2 NVMe OS-Laufwerke (RAID 1)
- 256 GB RAM
- 32 Cores (2x 16-Core Intel Gold 6426Y 2.5GHz 185W )
1x Fusion HCI Storage Server (9155-C14) -
- 2x 960GB M.2 NVMe OS-Laufwerke (RAID 1)
- 1024 GB RAM
- 64 Cores (2x 32-Kern Intel Gold 6438 2.0GHz 205W Prozessoren)
1x Fusion HCI Service Node
1x IBM SF GPU Server (9155-G03)
- 2x M.2 960GB NVMe drives for the operating system and the drives are in a RAID 1 configuration
- 2x AMD EPYC 9254 24C 200W 2.9GHz
- 768GB RAM (24x 32GB TruDDR5 4800MHz (2Rx8) RDIMM-A)
- 4x Nvidia L40S 48 GB GPU
We have to rip out other hardware and plan everything for the onboarding.
ToDo's
- Planning Power consumtion
- Planning delivery with GWS
- Planning rack space
- ➡️ Right rack top 1/2 of the rack.
- Relocate the servers
- What is with switch
dgs-3630-1? - inf3 -> @dmoessne move stuff to a VM
- ucs56 -> Remove from ISAR cluster
- inf1 -> Time for RHEL10 - core services (inf1/inf31) #288 - move to sf1
- inf44 -> powered of - ready to store in the basement
- inf31 -> Time for RHEL10 - core services (inf1/inf31) #288 - move to a VM
- What is with switch
- Or Maybe remove because of power consumtion