Skip to content

E2E (Full)

E2E (Full) #38

Triggered via schedule March 1, 2026 06:20
Status Failure
Total duration 5m 50s
Artifacts

ci-e2e-full.yml

on: schedule
Matrix: run-e2e-android
Matrix: run-e2e-ios
Fit to window
Zoom out
Zoom in

Annotations

8 errors
run-e2e-android (android-latest, max)
Process completed with exit code 1.
run-e2e-android (android-min, min)
The strategy configuration was canceled because "run-e2e-android.android-latest_max" failed
run-e2e-android (android-min, min)
The operation was canceled.
run-e2e-android (android-min, min)
Process completed with exit code 1.
run-e2e-ios (ios-latest)
Process completed with exit code 127.
run-e2e-ios (ios-latest)
Process completed with exit code 1.
run-e2e-ios (ios-min)
The strategy configuration was canceled because "run-e2e-ios.ios-latest" failed
run-e2e-ios (ios-min)
The operation was canceled.