Skip to content

refactor: Bump bcryptjs from 3.0.2 to 3.0.3 #9008

refactor: Bump bcryptjs from 3.0.2 to 3.0.3

refactor: Bump bcryptjs from 3.0.2 to 3.0.3 #9008

Triggered via pull request January 27, 2026 17:03
Status Cancelled
Total duration 2m 16s
Artifacts

ci.yml

on: pull_request
Node Engine Check
27s
Node Engine Check
Lint
35s
Lint
Check Definitions
28s
Check Definitions
Circular Dependencies
30s
Circular Dependencies
Docker Build
2m 6s
Docker Build
NPM Lock File Version
9s
NPM Lock File Version
Check Types
29s
Check Types
Matrix: Code Analysis
Matrix: check-mongo
Matrix: check-postgres
Fit to window
Zoom out
Zoom in

Annotations

17 errors
Code Analysis (javascript)
CodeQL Action major versions v1 and v2 have been deprecated. Please update all occurrences of the CodeQL Action in your workflow files to v3. For more information, see https://github.blog/changelog/2025-01-10-code-scanning-codeql-action-v2-is-now-deprecated/
MongoDB 7, ReplicaSet
Canceling since a higher priority waiting request for ci-refs/pull/10022/merge exists
PostgreSQL 18, PostGIS 3.6
Canceling since a higher priority waiting request for ci-refs/pull/10022/merge exists
Node 22
Canceling since a higher priority waiting request for ci-refs/pull/10022/merge exists
Redis Cache
Canceling since a higher priority waiting request for ci-refs/pull/10022/merge exists
Redis Cache
The operation was canceled.
Node 20
Canceling since a higher priority waiting request for ci-refs/pull/10022/merge exists
Node 20
The operation was canceled.
MongoDB 8, ReplicaSet
Canceling since a higher priority waiting request for ci-refs/pull/10022/merge exists
MongoDB 8, ReplicaSet
The operation was canceled.
PostgreSQL 16, PostGIS 3.5
Canceling since a higher priority waiting request for ci-refs/pull/10022/merge exists
PostgreSQL 16, PostGIS 3.5
The operation was canceled.
PostgreSQL 17, PostGIS 3.5
Canceling since a higher priority waiting request for ci-refs/pull/10022/merge exists
PostgreSQL 17, PostGIS 3.5
The operation was canceled.
Docker Build
Canceling since a higher priority waiting request for ci-refs/pull/10022/merge exists
Docker Build
The operation was canceled.
ci
Canceling since a higher priority waiting request for ci-refs/pull/10022/merge exists