Skip to content

Merge pull request #428 from tnull/2025-01-start-verifying-gossip #1300

Merge pull request #428 from tnull/2025-01-start-verifying-gossip

Merge pull request #428 from tnull/2025-01-start-verifying-gossip #1300

Triggered via push January 23, 2025 12:13
Status Failure
Total duration 6h 15m 26s
Artifacts

rust.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 2 warnings
build (ubuntu-latest, stable)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 360 minutes.
build (ubuntu-latest, stable)
The operation was canceled.
build (macos-latest, beta)
The job was canceled because "ubuntu-latest_stable" failed.
build (macos-latest, beta)
The operation was canceled.
build (ubuntu-latest, beta)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build (ubuntu-latest, 1.75.0)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636