Skip to content

Paper's schedules are inconsistent with code #5

@loris2222

Description

@loris2222

Hi, I am still having issues replicating your results by following the instructions and algorithms in the paper.

I have found that the schedules described in the paper are not consistent with what is present in the code, and I think that schedule optimization is a very relevant issue for performance. Indeed, there is high variability of fooling rates between schedules.

As an example, this is the schedule for Patch-RS as described in the paper (page 15):
image

And this is what I have found in the code (rs_attack.py 200):
image

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions