Skip to content

Bump net.bytebuddy:byte-buddy from 1.18.3 to 1.18.4 #1087

Bump net.bytebuddy:byte-buddy from 1.18.3 to 1.18.4

Bump net.bytebuddy:byte-buddy from 1.18.3 to 1.18.4 #1087

Triggered via push January 16, 2026 21:03
Status Failure
Total duration 11m 28s
Artifacts 3

ci.yml

on: push
Event File
4s
Event File
Matrix: ci-build
Fit to window
Zoom out
Zoom in

Annotations

3 errors, 6 warnings, and 2 notices
ci-build (windows-latest, 21)
Process completed with exit code 1.
ci-build (macos-15-intel, 21)
The strategy configuration was canceled because "ci-build.windows-latest_21" failed
ci-build (macos-15-intel, 21)
The operation was canceled.
ci-build (windows-latest, 21)
Restore cache failed: Dependencies file is not found in D:\a\docker-remote-api-client\docker-remote-api-client. Supported file pattern: go.sum
ci-build (macos-15-intel, 21)
No files were found with the provided path: **/build/test-results/test/TEST-*.xml. No artifacts will be uploaded.
ci-build (macos-15-intel, 21)
`$HOMEBREW_NO_INSTALLED_DEPENDENTS_CHECK` is set: not checking for outdated dependents or dependents with broken linkage!
1 out of 2 runs failed: serviceList() (de.gesellix.docker.remote.api.client.ServiceApiIntegrationTest): de.gesellix.docker.remote.api.client.ServiceApiIntegrationTest#L0
artifacts/Test Results (Java 21 on windows-latest)/api-client/build/test-results/test/TEST-de.gesellix.docker.remote.api.client.ServiceApiIntegrationTest.xml [took 4s]
1 out of 2 runs failed: containerArchiveInfoGetAndPut() (de.gesellix.docker.remote.api.client.ContainerApiIntegrationTest): de.gesellix.docker.remote.api.client.ContainerApiIntegrationTest#L0
artifacts/Test Results (Java 21 on windows-latest)/api-client/build/test-results/test/TEST-de.gesellix.docker.remote.api.client.ContainerApiIntegrationTest.xml [took 2s]
1 out of 2 runs failed: taskListInspect() (de.gesellix.docker.remote.api.client.TaskApiIntegrationTest): de.gesellix.docker.remote.api.client.TaskApiIntegrationTest#L0
artifacts/Test Results (Java 21 on windows-latest)/api-client/build/test-results/test/TEST-de.gesellix.docker.remote.api.client.TaskApiIntegrationTest.xml [took 4s]
16 skipped tests found
There are 16 skipped tests, see "Raw output" for the full list of skipped tests.
270 tests found
There are 270 tests, see "Raw output" for the full list of tests.

Artifacts

Produced during runtime
Name Size Digest
Test Results (Java 21 on ubuntu-latest)
33 KB
sha256:e78d5db8779cf8c10ecc784cab5b7e964c8c4a5f6efbdfb519de38f8fd679db6
Test Results (Java 21 on windows-latest)
41.5 KB
sha256:c5032f2a68ec93c35fd7187b61e3ff68acb4a4e6213d0113fdccd0087d6dfdeb
event-file
2.28 KB
sha256:a3c4d40d99463ecc3485230c1f4b08eb77acaefe0c4ad52d424200e3e9b4154d