Skip to content

Clangd (#82)

Clangd (#82) #656

Triggered via push November 13, 2025 03:26
Status Failure
Total duration 6h 4m 0s
Artifacts

ci.yml

on: push
Matrix: build-sample-environments
Matrix: build-ui-metadata
Matrix: nix-flake-check
Matrix: test
Matrix: verify-nixpkgs-revs
Fit to window
Zoom out
Zoom in

Annotations

5 errors
cpp (Linux)
No space left on device
nix-flake-check (Linux)
No space left on device
haskell (Linux, -f ghc98)
No space left on device
go (Linux)
No space left on device
octave (macOS)
The self-hosted runner lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.